DETAILED SERVICES

1. Highway geometric design

Structure and List of Deliverables

Specialty: Geometric Road Design

Technical Report and Design Criteria

  • Project overview: Geographical location, scope, design speedVd), road category (primary, secondary, tertiary) and projected traffic demand.
  • Applicable regulations: Manual or reference technical standard (e.g., INVIAS, AASHTO, DG-MTC, SIECA, SCT) and justification of the regulatory parameters.
  • Adopted geometric parameters:
    • Minimum radii, circular curves and minimum/maximum tangents.
    • Governing and maximum allowable longitudinal slopespMax).
    • Roadway width, shoulders, standard cross-slope (2%), and design of extra-wide sections.
    • Transition lengths and maximum superelevation tableseMax).
    • Vertical curvature parameters K for concave and convex curves (stopping sight distance and passing sight distance criteria).
  • Trace consistency: Evaluation of operating speed profilesV85) and curvature diagrams.

Calculation Memos, Portfolios, and Numerical Reports

Deliverable Main Content and Reports
Portfolio of the Axis
Horizontal Alignment
Coordinates (N, E), stationing (K+), azimuths/bearings, deflections, radii, spiral parameters (Ls, A) and main geometric elements (PI, PC, PT, TE, EC, CE, ET).
Grade Book
Vertical Alignment
Abscissas and elevations of PIV, BVC, EVC, incoming/outgoing grades (m, n), vertical curve length (Lv), parameter K and corrections by arrow/ordinate.
Portfolio of Superelevations and Widenings Flattening abscissas, linear/spiral transition, and full superelevation per lane and shoulder, complemented by the distribution and development of widenings.
Chamfer Book / Slope Stakes Field Book Horizontal distances and elevations of zero points (cut and fill slopes) to the left and right of the design centerline.
Earthmoving and Volumes Calculation of areas, cut and fill volumes, stripping/clearing, bulking/compaction factors, and mass haul diagram (Brückner curve).

Construction Drawing Set

Sheet type Details and Graphic Elements
Key Plan / Drawing Index Macro/micro location, general route polygon, legend box, and project sheet layout.
Typical Cross Sections Pavement structure, lanes, shoulders, ditches, cut/fill slopes (H:V), theoretical slope stakes, and clearing limits.
Plan and Profile (Combined) • Plant: Chained axis, contour lines, slope lines, cross drainage structures, and property impacts.
• Profile: Ground level vs. subgrade, elevations, slopes, parameters K, curvature diagram and aligned superelevation diagram.
Construction Cross Sections Regularly spaced grids (every 10 m or 20 m) and at singular points (PC, PT, SC, CS, PI, culverts) with elevations, areas, and chamfers.
Special Detail Plans At-grade and grade-separated intersections, roundabouts, U-turns, bus bays/passing bays, and road access points.

Digital Deliverables and Modeling

Component Deliverable Description Format
Digital Design Report Complete document of the descriptive and analytical report, regulatory criteria, calculation annexes, and conclusions in an editable and printable format. .PDF
3D Modeling / BIM Source Files Native files of the road geometric design software with the corridor model, assemblies/typical sections, terrain and construction surfaces (top/datum). .DWG (Civil 3D) files .DGN (OpenRoads)
Exchange Models and Geometries Export of horizontal/vertical alignments, triangulated irregular networks (TIN), and corridor 3D solids for interoperability with other disciplines. .LandXML .IFC
Vector Plans and Plotting Files Standardized layered plans, pen styles (CTB/STB), linked external references, and a digitized set of construction-ready drawings. .DWG .PDF

2. Pavement design with basic traffic study

Structure and List of Deliverables

Specialty: Structural Design of Pavements (Flexible, Rigid, Interlocking, and Semirigid)

Technical Report and Design Criteria

  • Project overview: Geographical location, climatic characterization (precipitation, mean and seasonal temperature), design period (years), and typology of evaluated structures.
  • Traffic and load spectrum study:
    • Average Weekly Daily Traffic (AWDT), vehicle composition by axle typology (C2P, C2G, C3, C4, C5, articulated trucks).
    • Calculation of Damage Factors / Load Equivalence Factors (LEF) and projected growth rates.
    • Determination of the number of Equivalent Single Axle Loads (ESALs) of 8.2 ton / 80 kN (ESALs / N) in the design lane.
  • Subgrade and soil characterization:
    • Sectorization and definition of homogeneous sections using statistical analysis (Cumulative Differences Method).
    • Determination of CBR of designCBRthis), Resilient Module (Mr), moisture susceptibility/expansion, and water table level.
  • Regulations and methodology adopted: Justification of the calculation method (AASHTO 93, Mechanistic-Empirical MEPDG, INVIAS, PCA, Shell, Concrete Pavement Guide).
  • Reliability and serviceability parameters: Reliability level (R), global standard deviation (So), loss of serviceability (ΔPSI), concrete modulus of rupture (MR), charge transfer coefficient (J) and drainage coefficients (mi / Cd).

Calculation Memos, Portfolios, and Numerical Reports

Deliverable Main Content and Reports
Thickness Calculation
Flexible Pavement
Required Structural Number (SNreq), layer structural coefficients (a1, a2, a3), drainage coefficients (m2, m3) and verification of the structural package (SNProposed ≥ SNreq) by homogeneous sector.
Slab and Joint Calculation
Rigid Pavement
Slab thickness (D), fatigue and erosion analysis (PCA), dowel bar sizing (diameter, length, spacing), tie bars, and longitudinal and transverse joint layout/sealing.
Mechanistic-Empirical Modeling
Stress-Strain Analysis
Multilayer elastic modeling: tensile strain in the lower asphalt fiber (εt), vertical compressive strain in the subgrade (εv), fatigue laws, rutting, and accumulated damage.
Hydraulic Calculation of Subdrainage Evacuation capacity and drainage time of granular layers, geometric and hydraulic design of longitudinal subdrains, geotextile filter, drainage blankets and relief outlets.
Bill of Quantities and Volumes Volumetric calculation of asphalt mixture (wearing course, base course), hydraulic concrete, granular base/subbase, stabilizations, asphalt sprays (prime coat and tack coat), dowels, geogrids, and geotextiles.

Construction Drawing Set

Sheet type Details and Graphic Elements
Sectoring Plan and Typical Structural Packages Schematic project plan view showing the delineation of homogeneous sections (stationing K+ start to K+ end) and dimensioned cross-section details of the structural package adopted for each section.
Joint Layout Plans (Rigid Pavement) Slab layout in plan view, location and spacing of dowel bars, tie bars, expansion/isolation joints, and joint sealant reservoir details.
Transition and Tie-In Plans Longitudinal and transverse tie-in details between new and existing pavements, flexible-to-rigid pavement transitions, and bridge/box-culvert approach slabs.
Roadway Drainage and Subsurface Drainage Details Cross-sections of drainage trenches, French drains, slotted perforated pipes, geotextile wrapping, and discharge details to ditches, gutters, and culverts/drainage structures.
Special and Singular Detail Plans Reinforced pavement structures at bus bays, toll/weigh stations, intersection deceleration/braking zones, U-turns, and shoulder widenings.

Digital Deliverables and Modeling

Component Deliverable Description Format
Digital Design Report Complete descriptive and analytical report, traffic study, geotechnical characterization, calculation notes, technical specifications, and appendices. .DOCX .PDF
Structural Calculation and Modeling Files Spreadsheets with formulas and run files from specialized pavement structural design software (DARWin, WinPAS, KENLAYER, KENSLABS, BISAR, StreetPave). .XLSX Archivos fuente
Roadway BIM and Assembly Models Subassemblies and structural layers incorporated into the roadway corridor model for material takeoff, earthwork grading, and BIM coordination/compatibility. .DWG .DGN .IFC
Vector Plans and Plotting Files Standardized layered plans, pen styles (CTB/STB), linked external references, and a digitized set of construction-ready drawings. .DWG .PDF

3. Complete Traffic Design

Structure and List of Deliverables

Specialty: Traffic Study, Capacity, Traffic Management Plan (TMP), and Road Safety

Technical Report and Design Criteria

  • General Description and Area of Influence: Delineation of direct area of influence (DAI) and indirect area of influence (IAI), characterization of the road network, land uses, and operational environment.
  • Multi-Stakeholder Comprehensive Approach: Diagnosis and demand by transport mode: pedestrians (including persons with reduced mobility), cyclists / micromobility, public/mass transit, private vehicles, and freight transport.
  • Current Situation Diagnosis (Baseline):
    • Classified vehicle traffic counts (hourly turning movement counts, AADT, PHF), pedestrian counts, and bike-inclusive counts.
    • Measurement of travel speeds, delays, queue lengths, and roadway and traffic signal infrastructure inventory.
    • Current Level of Service (LOS) and volume-to-capacity (v/c) ratio on continuous road segments (basic segments) and at intersections (unsignalized/priority, signalized, and roundabouts).
  • Traffic Modeling and Future Projections:
    • Demand forecasting for short-, medium-, and long-term horizons (growth rates, trip generation/attraction, and diverted/attracted traffic).
    • Future scenario evaluation: Baseline Scenario (Without Project) vs. With-Project Scenario. Escenario Base (Sin Proyecto) vs. Escenario con Proyecto.
  • Multivariable Solution Assessment: Multicriteria formulation and prioritization of operational alternatives, intersection geometric redesigns, flow segregation, traffic signal management, and traffic calming measures.

Calculation Notes, Operational Reports, and Microsimulation

Deliverable Main Content and Reports
Capacity and Level of Service Analysis (HCM) Detailed reports on Levels of Service (LOS A–F), average delays (s/veh, s/ped), and degree of saturation (v/c) both for roadway segments (basic/continuous flow segments) and for road intersections, pedestrian crossings, and crosswalks.
Traffic Signal Design and Optimization Calculation of optimal cycle lengths (Webster's method), split phases (green/yellow/all-red), offsets for green waves (synchronization/coordination), pedestrian clearance intervals, and time-space diagrams.
Traffic Modeling and Microsimulation Model calibration/validation reports (GEH statistic, R² correlation), operational statistics for queue lengths, travel times, density, and peak-hour simulation video recordings.
Road Safety Audit / Assessment Identification of black spots/hotspots (high-conflict segments and nodes), historical crash/collision analysis, risk matrices, and proposals for warning/corrective signing and marking.
Traffic Management Plans (TMP) Mitigation strategies classified by impact level:
• Low impact: Partial shoulder/sidewalk closures or short-duration nighttime works.
• Medium impact: Single-lane closures with alternating one-way traffic control (stop/slow - flagger control) and minor local detours.
• High impact: Full roadway/carriageway closures, implementation of contraflow lanes, major detour routes, and temporary transit route restructuring.

Set of Construction and Operational Drawings (Drawing Set)

Sheet type Details and Graphic Elements
Traffic Flow and Assignment Plans Desire line diagrams, intersection turning movement volume diagrams, pedestrian demand, and freight spatial distribution for existing and future scenarios.
Permanent Road Signage and Pavement Marking Plans Design and layout of vertical traffic signs (regulatory, warning, guide/informational), horizontal pavement markings (lines, arrows, crosswalks, legends/symbols), and channelizing devices.
Traffic Signal Network and Phasing Plans Physical location of traffic signal poles, mast arms, vehicular/pedestrian signal heads, underground conduits, pull/junction boxes, vehicle detectors, and detailed signal phasing diagrams.
Traffic Management Plans (TMP) Sheets broken down by construction phases: work zone layout (advance warning area, transition area, buffer space, work space, termination area), temporary work-zone signing and devices, vehicular detour routes, and protected pedestrian walkways.
Tactical Urbanism and Accessibility Plans Geometric details of curb extensions/bulb-outs, sidewalk widening, universal accessibility curb ramps (tactile paving/warning indicators), raised crosswalks (speed tables), and protected/segregated bicycle infrastructure.

Digital Deliverables and Modeling

Component Deliverable Description Format
Digital Design Report Consolidated technical report containing traffic counts, existing/future diagnosis, multicriteria analysis, HCM evaluation, TMP plans, and stakeholder engagement/approval minutes. .DOCX .PDF
Modeling and Simulation Files Native/source model files for microsimulation, macrosimulation, and traffic signal optimization (Synchro, SimTraffic, VISSIM, Aimsun, SIDRA Intersection, TransCAD). .SYN .INPX .SIP
Spreadsheets and Traffic Count Databases Complete tabulations of raw and consolidated vehicular/pedestrian traffic counts by 15-minute intervals, origin-destination matrices, and dynamic HCM calculation sheets. .XLSX .CSV
Vector Plans and Plotting Files Drawing set for road signage, traffic signaling, and TMP on standardized layers, sign quantity schedules/bills of quantities, and submission-ready files. .DWG .PDF

4. BIM Integration and High-Impact Marketing/Commercial Models

Structure and List of Deliverables

Specialty: Roadway BIM Integration, Multidisciplinary Coordination, and High-Impact Commercial Modeling (Render & Animation)

Technical Report, BIM Integration Criteria, and Requirements

  • BIM Execution Plan (BEP) and Commercial Scope: Definition of Levels of Development and Information (LOD/LOI and low/high commercial detail packages), shared georeferenced coordinate systems, and responsibility assignment matrix.
  • Technical Requirements and Input Data (Provided by Specialists):
    • Roadway geometric design models, profile grade lines, and pavement design reports.
    • Design and layout of vertical and horizontal road signage, pavement markings, and traffic signal networks.
    • Modeling of complex drainage and crossing structures (bridges, viaducts, box-culverts, pipe culverts, and retaining walls).
    • Utility network design (potable water supply, sanitary/storm sewer, gas mains, overhead/underground power lines, and telecommunications, including corresponding pull boxes and manholes).
  • Context Modeling and Realistic Immersive Experience (Developed by the BIM Team):
    • Urban/rural contextual modeling, actual topography, and facade texturing for surrounding buildings and parcels.
    • Integration of street furniture, native vegetation/landscaping, public lighting, and tactical urbanism elements.
    • Simulation of vehicular traffic dynamics and continuous multi-stakeholder pedestrian flows in motion.
    • Implementation of corporate identity and institutional branding of the contracting/promoting entity.
  • Multidisciplinary Coordination and Clash Detection: Model federation workflow, automated clash detection, and conflict resolution traceability.

Calculation Notes, BIM Coordination Reports, and Quality Audits

Deliverable Main Content and Reports
Clash Detection Report Matrix of spatial clashes and interferences (Hard / Soft / Clearance Clashes) across roadway design, structural elements, wet utilities, dry utilities, and drainage works, including priority assignments and mitigation status.
IFC Data and Parameter Matrix Asset metadata mapping schema (Property Sets / Psets) assigned to IFC entities: pay item codes, pavement layer volumes, sign types, pipe diameters, and asset ownership.
BIM Quantity Takeoff Report (QTO) Automated extraction of bills of quantities directly from the federated model (paving surface areas, earthwork cut/fill volumes, utility run lengths, street furniture, and signage counts).
Rendering and Visual Assets Data Sheet Atmospheric condition setups (daylight, dusk/golden hour, nighttime with active street lighting), camera specifications, focal lengths, framing, and render walkthrough paths.

Coordination Drawings and High-Impact Visual Set (Visual Package)

Visual Deliverable Type Details and Graphic Elements
High-Resolution Commercial Render Set Photorealistic 4K/8K images with full environmental staging: drone/aerial views, eye-level pedestrian perspectives, driver/vehicular perspectives, daytime, nighttime, and golden hour shots.
Animated Virtual Walkthroughs and Flythroughs Pre-edited and post-produced cinematic animations (color grading, transitions, background music/sound design, corporate lower thirds, institutional logos, and explanatory text callouts).
BIM Coordination and Utility Drawings Combined plan-and-section sheets illustrating the roadway corridor fully integrated with all underground/overhead utilities, manholes, inspection boxes, and crossing structures.
Urban Integration and Landscaping Schematics Urban layout and site integration sheets detailing contextualized building facades, green spaces, pedestrian corridors, cycle tracks, and commercial impact zones.

Digital Deliverables, 3D Models, and Exchange Formats

Component Deliverable Description Format
Digital Design Report and BEP Comprehensive BIM integration report, multidisciplinary coordination report, model navigation manual, and rendering documentation. .DOCX .PDF
Native Integration and Rendering Models Source modeling and environmental staging files:
• Detailed staging and street furniture models.
• Parametric context and infrastructure models.
• Advanced lighting and rendering scenes (Twinmotion, Lumion, Unreal Engine, 3ds Max, Enscape).
.SKP (SketchUp) .IWX / .SQLITE (InfraWorks) Render engine scene files
Federated Coordination Models and Specialties Integration of specialized engineering models covering roadway, structures, drainage, and utilities sourced from various design and engineering platforms. .NWD / .NWC (Navisworks) .RVT (Revit) .DWG (Civil 3D) files Archivos ISTRAM
Open Formats and Interoperability Models (OpenBIM) Export of federated models with consolidated geometry and embedded property databases for open viewing and universal compatibility. .IFC .LandXML .FBX / .OBJ
Final Multimedia Assets (Pre- and Post-Production) High-resolution rendered image pack and mastered video clips delivered in standard formats optimized for commercial broadcasting, web, and social media. .PNG / .TIFF (4K/8K) .MP4 / .MOV (4K UHD)

5. Construction Field Specialist / Supervision and Inspection (Interventoría)

Structure and List of Deliverables

Specialty: Specialized Technical Advisory in Highway Engineering, Quality Control, and Construction Supervision (Interventoría)

Technical Report, Quality Control Criteria, and Comprehensive Monitoring

  • Scope of Services and Legal/Contractual Framework: Technical, administrative, financial, environmental, and road safety supervision and control in accordance with national regulations and standards (INVIAS, IDU, ANI, or local departmental/municipal authorities).
  • Review, Validation, and Adjustment of Studies and Designs:
    • Consistency verification of geometric design (alignments, superelevations, sight distances, and staking/survey field books).
    • Validation of pavement structural design, mix design formulations (JMF/HMA), aggregate sources, and test sections/trial strips.
    • Subgrade bearing capacity review (CBR, FWD/HWD deflections, in-situ field densities).
    • Compliance monitoring of Traffic Management Plans (TMP) and road safety protocols for road users and construction personnel.
  • Construction Inspection and Quality Control Plan (PCIO): Definition of sampling frequencies, horizontal/vertical geometric tolerances, and acceptance or rejection protocols for executed work items.
  • Technical Opinions and Non-Conformance Resolution: Issuance of engineering technical opinions on unforeseen geotechnical conditions, alignment adjustments, pavement package changes, or utility interferences.

Technical Reports, Official Minutes/Records, Control Field Books, and Quantitative Reports

Deliverable Main Content and Reports
Periodic Supervision / Advisory Reports (Interventoría) Weekly and monthly physical and financial progress reports: S-curve (planned vs. actual), equipment and labor balance, traceable photographic records, and critical path early warnings.
Quality Dossier and Laboratory Test Reports Compilation and statistical validation of material testing: sieve analyses (gradation), Atterberg limits, Los Angeles abrasion, Marshall/Superpave Gyratory stability and flow, in-situ field density, and concrete compressive/flexural strength test results.
Vertical and Geometric Control Field Books Survey verification of finished grade elevations, compacted layer thicknesses, roadway and shoulder widths, actual as-built superelevations, and vertical clearance/cross-section checks.
Traffic Audit and TMP Compliance Verification Field monitoring records of temporary work-zone signage, detour conditions, flagger/traffic controller performance, pedestrian walkway maintenance, and road safety inspection logs.
Variation Orders, Unit Prices, and Quantity Adjustment Minutes Technical review and formal approval of overrun/underrun quantity sheets, unit price analysis (APU) for unforeseen/extra work items, and engineering justifications for time extensions and contract amendments.

As-Built Drawing Set and Quality Control Schematics

Sheet type Details and Graphic Elements
As-Built Drawings Final horizontal, vertical, and cross-sectional geometry of the roadway as actually constructed, showing the exact locations of drainage structures/culverts, subsurface drains, and retaining walls.
Field Modifications and Redesign Drawings Detailed plans and schematics resulting from engineering adjustments approved on-site (alignment shifts, culvert relocations, pavement transitions).
Relocated Utilities Coordination Drawings Georeferenced utility plans identifying all public services and utilities relocated or protected in place during road construction.
Testing Sectoring and Homogeneous Section Schematics Longitudinal control sheets displaying sampling stations for field densities, asphalt core extraction locations, and roughness/deflection testing stretches (IRI / deflectometry).

Digital Deliverables, Modeling, and Technical Closeout

Component Deliverable Description Format
Final Report and Technical Closeout Certificate Consolidated final construction closeout report, final reconciliation of executed quantities, technical clearances/releases, and routine/periodic maintenance recommendations. .DOCX .PDF
As-Built Database and 7D BIM Models Updated digital corridor models incorporating as-built information for turnover to the contracting agency and for road operation and maintenance. .DWG .IFC .LandXML
Site Logbook and Digital Quality Record Digitized site work logbook (bitácora), supplier material compliance certificates, field density logs, and traceability records of resolved non-conformances. .XLSX .PDF
As-Built Vector Plans and Plotting Files Complete set of final as-built drawings in CAD format, fully titled, stamped/signed, and digitized. .DWG .PDF
WhatsApp