DETAILED SERVICES
1. Highway geometric design
Structure and List of Deliverables
Specialty: Geometric Road Design
Technical Report and Design Criteria
- Project overview: Geographical location, scope, design speedVd), road category (primary, secondary, tertiary) and projected traffic demand.
- Applicable regulations: Manual or reference technical standard (e.g., INVIAS, AASHTO, DG-MTC, SIECA, SCT) and justification of the regulatory parameters.
- Adopted geometric parameters:
- Minimum radii, circular curves and minimum/maximum tangents.
- Governing and maximum allowable longitudinal slopespMax).
- Roadway width, shoulders, standard cross-slope (2%), and design of extra-wide sections.
- Transition lengths and maximum superelevation tableseMax).
- Vertical curvature parameters K for concave and convex curves (stopping sight distance and passing sight distance criteria).
- Trace consistency: Evaluation of operating speed profilesV85) and curvature diagrams.
Calculation Memos, Portfolios, and Numerical Reports
| Deliverable | Main Content and Reports |
|---|---|
| Portfolio of the Axis Horizontal Alignment |
Coordinates (N, E), stationing (K+), azimuths/bearings, deflections, radii, spiral parameters (Ls, A) and main geometric elements (PI, PC, PT, TE, EC, CE, ET). |
| Grade Book Vertical Alignment |
Abscissas and elevations of PIV, BVC, EVC, incoming/outgoing grades (m, n), vertical curve length (Lv), parameter K and corrections by arrow/ordinate. |
| Portfolio of Superelevations and Widenings | Flattening abscissas, linear/spiral transition, and full superelevation per lane and shoulder, complemented by the distribution and development of widenings. |
| Chamfer Book / Slope Stakes Field Book | Horizontal distances and elevations of zero points (cut and fill slopes) to the left and right of the design centerline. |
| Earthmoving and Volumes | Calculation of areas, cut and fill volumes, stripping/clearing, bulking/compaction factors, and mass haul diagram (Brückner curve). |
Construction Drawing Set
| Sheet type | Details and Graphic Elements |
|---|---|
| Key Plan / Drawing Index | Macro/micro location, general route polygon, legend box, and project sheet layout. |
| Typical Cross Sections | Pavement structure, lanes, shoulders, ditches, cut/fill slopes (H:V), theoretical slope stakes, and clearing limits. |
| Plan and Profile (Combined) |
• Plant: Chained axis, contour lines, slope lines, cross drainage structures, and property impacts. • Profile: Ground level vs. subgrade, elevations, slopes, parameters K, curvature diagram and aligned superelevation diagram. |
| Construction Cross Sections | Regularly spaced grids (every 10 m or 20 m) and at singular points (PC, PT, SC, CS, PI, culverts) with elevations, areas, and chamfers. |
| Special Detail Plans | At-grade and grade-separated intersections, roundabouts, U-turns, bus bays/passing bays, and road access points. |
Digital Deliverables and Modeling
| Component | Deliverable Description | Format |
|---|---|---|
| Digital Design Report | Complete document of the descriptive and analytical report, regulatory criteria, calculation annexes, and conclusions in an editable and printable format. | |
| 3D Modeling / BIM Source Files | Native files of the road geometric design software with the corridor model, assemblies/typical sections, terrain and construction surfaces (top/datum). | .DWG (Civil 3D) files .DGN (OpenRoads) |
| Exchange Models and Geometries | Export of horizontal/vertical alignments, triangulated irregular networks (TIN), and corridor 3D solids for interoperability with other disciplines. | .LandXML .IFC |
| Vector Plans and Plotting Files | Standardized layered plans, pen styles (CTB/STB), linked external references, and a digitized set of construction-ready drawings. | .DWG .PDF |
2. Pavement design with basic traffic study
Structure and List of Deliverables
Specialty: Structural Design of Pavements (Flexible, Rigid, Interlocking, and Semirigid)
Technical Report and Design Criteria
- Project overview: Geographical location, climatic characterization (precipitation, mean and seasonal temperature), design period (years), and typology of evaluated structures.
- Traffic and load spectrum study:
- Average Weekly Daily Traffic (AWDT), vehicle composition by axle typology (C2P, C2G, C3, C4, C5, articulated trucks).
- Calculation of Damage Factors / Load Equivalence Factors (LEF) and projected growth rates.
- Determination of the number of Equivalent Single Axle Loads (ESALs) of 8.2 ton / 80 kN (ESALs / N) in the design lane.
- Subgrade and soil characterization:
- Sectorization and definition of homogeneous sections using statistical analysis (Cumulative Differences Method).
- Determination of CBR of designCBRthis), Resilient Module (Mr), moisture susceptibility/expansion, and water table level.
- Regulations and methodology adopted: Justification of the calculation method (AASHTO 93, Mechanistic-Empirical MEPDG, INVIAS, PCA, Shell, Concrete Pavement Guide).
- Reliability and serviceability parameters: Reliability level (R), global standard deviation (So), loss of serviceability (ΔPSI), concrete modulus of rupture (MR), charge transfer coefficient (J) and drainage coefficients (mi / Cd).
Calculation Memos, Portfolios, and Numerical Reports
| Deliverable | Main Content and Reports |
|---|---|
| Thickness Calculation Flexible Pavement |
Required Structural Number (SNreq), layer structural coefficients (a1, a2, a3), drainage coefficients (m2, m3) and verification of the structural package (SNProposed ≥ SNreq) by homogeneous sector. |
| Slab and Joint Calculation Rigid Pavement |
Slab thickness (D), fatigue and erosion analysis (PCA), dowel bar sizing (diameter, length, spacing), tie bars, and longitudinal and transverse joint layout/sealing. |
| Mechanistic-Empirical Modeling Stress-Strain Analysis |
Multilayer elastic modeling: tensile strain in the lower asphalt fiber (εt), vertical compressive strain in the subgrade (εv), fatigue laws, rutting, and accumulated damage. |
| Hydraulic Calculation of Subdrainage | Evacuation capacity and drainage time of granular layers, geometric and hydraulic design of longitudinal subdrains, geotextile filter, drainage blankets and relief outlets. |
| Bill of Quantities and Volumes | Volumetric calculation of asphalt mixture (wearing course, base course), hydraulic concrete, granular base/subbase, stabilizations, asphalt sprays (prime coat and tack coat), dowels, geogrids, and geotextiles. |
Construction Drawing Set
| Sheet type | Details and Graphic Elements |
|---|---|
| Sectoring Plan and Typical Structural Packages | Schematic project plan view showing the delineation of homogeneous sections (stationing K+ start to K+ end) and dimensioned cross-section details of the structural package adopted for each section. |
| Joint Layout Plans (Rigid Pavement) | Slab layout in plan view, location and spacing of dowel bars, tie bars, expansion/isolation joints, and joint sealant reservoir details. |
| Transition and Tie-In Plans | Longitudinal and transverse tie-in details between new and existing pavements, flexible-to-rigid pavement transitions, and bridge/box-culvert approach slabs. |
| Roadway Drainage and Subsurface Drainage Details | Cross-sections of drainage trenches, French drains, slotted perforated pipes, geotextile wrapping, and discharge details to ditches, gutters, and culverts/drainage structures. |
| Special and Singular Detail Plans | Reinforced pavement structures at bus bays, toll/weigh stations, intersection deceleration/braking zones, U-turns, and shoulder widenings. |
Digital Deliverables and Modeling
| Component | Deliverable Description | Format |
|---|---|---|
| Digital Design Report | Complete descriptive and analytical report, traffic study, geotechnical characterization, calculation notes, technical specifications, and appendices. | .DOCX .PDF |
| Structural Calculation and Modeling Files | Spreadsheets with formulas and run files from specialized pavement structural design software (DARWin, WinPAS, KENLAYER, KENSLABS, BISAR, StreetPave). | .XLSX Archivos fuente |
| Roadway BIM and Assembly Models | Subassemblies and structural layers incorporated into the roadway corridor model for material takeoff, earthwork grading, and BIM coordination/compatibility. | .DWG .DGN .IFC |
| Vector Plans and Plotting Files | Standardized layered plans, pen styles (CTB/STB), linked external references, and a digitized set of construction-ready drawings. | .DWG .PDF |
3. Complete Traffic Design
Structure and List of Deliverables
Specialty: Traffic Study, Capacity, Traffic Management Plan (TMP), and Road Safety
Technical Report and Design Criteria
- General Description and Area of Influence: Delineation of direct area of influence (DAI) and indirect area of influence (IAI), characterization of the road network, land uses, and operational environment.
- Multi-Stakeholder Comprehensive Approach: Diagnosis and demand by transport mode: pedestrians (including persons with reduced mobility), cyclists / micromobility, public/mass transit, private vehicles, and freight transport.
- Current Situation Diagnosis (Baseline):
- Classified vehicle traffic counts (hourly turning movement counts, AADT, PHF), pedestrian counts, and bike-inclusive counts.
- Measurement of travel speeds, delays, queue lengths, and roadway and traffic signal infrastructure inventory.
- Current Level of Service (LOS) and volume-to-capacity (v/c) ratio on continuous road segments (basic segments) and at intersections (unsignalized/priority, signalized, and roundabouts).
- Traffic Modeling and Future Projections:
- Demand forecasting for short-, medium-, and long-term horizons (growth rates, trip generation/attraction, and diverted/attracted traffic).
- Future scenario evaluation: Baseline Scenario (Without Project) vs. With-Project Scenario. Escenario Base (Sin Proyecto) vs. Escenario con Proyecto.
- Multivariable Solution Assessment: Multicriteria formulation and prioritization of operational alternatives, intersection geometric redesigns, flow segregation, traffic signal management, and traffic calming measures.
Calculation Notes, Operational Reports, and Microsimulation
| Deliverable | Main Content and Reports |
|---|---|
| Capacity and Level of Service Analysis (HCM) | Detailed reports on Levels of Service (LOS A–F), average delays (s/veh, s/ped), and degree of saturation (v/c) both for roadway segments (basic/continuous flow segments) and for road intersections, pedestrian crossings, and crosswalks. |
| Traffic Signal Design and Optimization | Calculation of optimal cycle lengths (Webster's method), split phases (green/yellow/all-red), offsets for green waves (synchronization/coordination), pedestrian clearance intervals, and time-space diagrams. |
| Traffic Modeling and Microsimulation | Model calibration/validation reports (GEH statistic, R² correlation), operational statistics for queue lengths, travel times, density, and peak-hour simulation video recordings. |
| Road Safety Audit / Assessment | Identification of black spots/hotspots (high-conflict segments and nodes), historical crash/collision analysis, risk matrices, and proposals for warning/corrective signing and marking. |
| Traffic Management Plans (TMP) | Mitigation strategies classified by impact level:
• Low impact: Partial shoulder/sidewalk closures or short-duration nighttime works. • Medium impact: Single-lane closures with alternating one-way traffic control (stop/slow - flagger control) and minor local detours. • High impact: Full roadway/carriageway closures, implementation of contraflow lanes, major detour routes, and temporary transit route restructuring. |
Set of Construction and Operational Drawings (Drawing Set)
| Sheet type | Details and Graphic Elements |
|---|---|
| Traffic Flow and Assignment Plans | Desire line diagrams, intersection turning movement volume diagrams, pedestrian demand, and freight spatial distribution for existing and future scenarios. |
| Permanent Road Signage and Pavement Marking Plans | Design and layout of vertical traffic signs (regulatory, warning, guide/informational), horizontal pavement markings (lines, arrows, crosswalks, legends/symbols), and channelizing devices. |
| Traffic Signal Network and Phasing Plans | Physical location of traffic signal poles, mast arms, vehicular/pedestrian signal heads, underground conduits, pull/junction boxes, vehicle detectors, and detailed signal phasing diagrams. |
| Traffic Management Plans (TMP) | Sheets broken down by construction phases: work zone layout (advance warning area, transition area, buffer space, work space, termination area), temporary work-zone signing and devices, vehicular detour routes, and protected pedestrian walkways. |
| Tactical Urbanism and Accessibility Plans | Geometric details of curb extensions/bulb-outs, sidewalk widening, universal accessibility curb ramps (tactile paving/warning indicators), raised crosswalks (speed tables), and protected/segregated bicycle infrastructure. |
Digital Deliverables and Modeling
| Component | Deliverable Description | Format |
|---|---|---|
| Digital Design Report | Consolidated technical report containing traffic counts, existing/future diagnosis, multicriteria analysis, HCM evaluation, TMP plans, and stakeholder engagement/approval minutes. | .DOCX .PDF |
| Modeling and Simulation Files | Native/source model files for microsimulation, macrosimulation, and traffic signal optimization (Synchro, SimTraffic, VISSIM, Aimsun, SIDRA Intersection, TransCAD). | .SYN .INPX .SIP |
| Spreadsheets and Traffic Count Databases | Complete tabulations of raw and consolidated vehicular/pedestrian traffic counts by 15-minute intervals, origin-destination matrices, and dynamic HCM calculation sheets. | .XLSX .CSV |
| Vector Plans and Plotting Files | Drawing set for road signage, traffic signaling, and TMP on standardized layers, sign quantity schedules/bills of quantities, and submission-ready files. | .DWG .PDF |
4. BIM Integration and High-Impact Marketing/Commercial Models
Structure and List of Deliverables
Specialty: Roadway BIM Integration, Multidisciplinary Coordination, and High-Impact Commercial Modeling (Render & Animation)
Technical Report, BIM Integration Criteria, and Requirements
- BIM Execution Plan (BEP) and Commercial Scope: Definition of Levels of Development and Information (LOD/LOI and low/high commercial detail packages), shared georeferenced coordinate systems, and responsibility assignment matrix.
- Technical Requirements and Input Data (Provided by Specialists):
- Roadway geometric design models, profile grade lines, and pavement design reports.
- Design and layout of vertical and horizontal road signage, pavement markings, and traffic signal networks.
- Modeling of complex drainage and crossing structures (bridges, viaducts, box-culverts, pipe culverts, and retaining walls).
- Utility network design (potable water supply, sanitary/storm sewer, gas mains, overhead/underground power lines, and telecommunications, including corresponding pull boxes and manholes).
- Context Modeling and Realistic Immersive Experience (Developed by the BIM Team):
- Urban/rural contextual modeling, actual topography, and facade texturing for surrounding buildings and parcels.
- Integration of street furniture, native vegetation/landscaping, public lighting, and tactical urbanism elements.
- Simulation of vehicular traffic dynamics and continuous multi-stakeholder pedestrian flows in motion.
- Implementation of corporate identity and institutional branding of the contracting/promoting entity.
- Multidisciplinary Coordination and Clash Detection: Model federation workflow, automated clash detection, and conflict resolution traceability.
Calculation Notes, BIM Coordination Reports, and Quality Audits
| Deliverable | Main Content and Reports |
|---|---|
| Clash Detection Report | Matrix of spatial clashes and interferences (Hard / Soft / Clearance Clashes) across roadway design, structural elements, wet utilities, dry utilities, and drainage works, including priority assignments and mitigation status. |
| IFC Data and Parameter Matrix | Asset metadata mapping schema (Property Sets / Psets) assigned to IFC entities: pay item codes, pavement layer volumes, sign types, pipe diameters, and asset ownership. |
| BIM Quantity Takeoff Report (QTO) | Automated extraction of bills of quantities directly from the federated model (paving surface areas, earthwork cut/fill volumes, utility run lengths, street furniture, and signage counts). |
| Rendering and Visual Assets Data Sheet | Atmospheric condition setups (daylight, dusk/golden hour, nighttime with active street lighting), camera specifications, focal lengths, framing, and render walkthrough paths. |
Coordination Drawings and High-Impact Visual Set (Visual Package)
| Visual Deliverable Type | Details and Graphic Elements |
|---|---|
| High-Resolution Commercial Render Set | Photorealistic 4K/8K images with full environmental staging: drone/aerial views, eye-level pedestrian perspectives, driver/vehicular perspectives, daytime, nighttime, and golden hour shots. |
| Animated Virtual Walkthroughs and Flythroughs | Pre-edited and post-produced cinematic animations (color grading, transitions, background music/sound design, corporate lower thirds, institutional logos, and explanatory text callouts). |
| BIM Coordination and Utility Drawings | Combined plan-and-section sheets illustrating the roadway corridor fully integrated with all underground/overhead utilities, manholes, inspection boxes, and crossing structures. |
| Urban Integration and Landscaping Schematics | Urban layout and site integration sheets detailing contextualized building facades, green spaces, pedestrian corridors, cycle tracks, and commercial impact zones. |
Digital Deliverables, 3D Models, and Exchange Formats
| Component | Deliverable Description | Format |
|---|---|---|
| Digital Design Report and BEP | Comprehensive BIM integration report, multidisciplinary coordination report, model navigation manual, and rendering documentation. | .DOCX .PDF |
| Native Integration and Rendering Models | Source modeling and environmental staging files:
• Detailed staging and street furniture models. • Parametric context and infrastructure models. • Advanced lighting and rendering scenes (Twinmotion, Lumion, Unreal Engine, 3ds Max, Enscape). |
.SKP (SketchUp) .IWX / .SQLITE (InfraWorks) Render engine scene files |
| Federated Coordination Models and Specialties | Integration of specialized engineering models covering roadway, structures, drainage, and utilities sourced from various design and engineering platforms. | .NWD / .NWC (Navisworks) .RVT (Revit) .DWG (Civil 3D) files Archivos ISTRAM |
| Open Formats and Interoperability Models (OpenBIM) | Export of federated models with consolidated geometry and embedded property databases for open viewing and universal compatibility. | .IFC .LandXML .FBX / .OBJ |
| Final Multimedia Assets (Pre- and Post-Production) | High-resolution rendered image pack and mastered video clips delivered in standard formats optimized for commercial broadcasting, web, and social media. | .PNG / .TIFF (4K/8K) .MP4 / .MOV (4K UHD) |
5. Construction Field Specialist / Supervision and Inspection (Interventoría)
Structure and List of Deliverables
Specialty: Specialized Technical Advisory in Highway Engineering, Quality Control, and Construction Supervision (Interventoría)
Technical Report, Quality Control Criteria, and Comprehensive Monitoring
- Scope of Services and Legal/Contractual Framework: Technical, administrative, financial, environmental, and road safety supervision and control in accordance with national regulations and standards (INVIAS, IDU, ANI, or local departmental/municipal authorities).
- Review, Validation, and Adjustment of Studies and Designs:
- Consistency verification of geometric design (alignments, superelevations, sight distances, and staking/survey field books).
- Validation of pavement structural design, mix design formulations (JMF/HMA), aggregate sources, and test sections/trial strips.
- Subgrade bearing capacity review (CBR, FWD/HWD deflections, in-situ field densities).
- Compliance monitoring of Traffic Management Plans (TMP) and road safety protocols for road users and construction personnel.
- Construction Inspection and Quality Control Plan (PCIO): Definition of sampling frequencies, horizontal/vertical geometric tolerances, and acceptance or rejection protocols for executed work items.
- Technical Opinions and Non-Conformance Resolution: Issuance of engineering technical opinions on unforeseen geotechnical conditions, alignment adjustments, pavement package changes, or utility interferences.
Technical Reports, Official Minutes/Records, Control Field Books, and Quantitative Reports
| Deliverable | Main Content and Reports |
|---|---|
| Periodic Supervision / Advisory Reports (Interventoría) | Weekly and monthly physical and financial progress reports: S-curve (planned vs. actual), equipment and labor balance, traceable photographic records, and critical path early warnings. |
| Quality Dossier and Laboratory Test Reports | Compilation and statistical validation of material testing: sieve analyses (gradation), Atterberg limits, Los Angeles abrasion, Marshall/Superpave Gyratory stability and flow, in-situ field density, and concrete compressive/flexural strength test results. |
| Vertical and Geometric Control Field Books | Survey verification of finished grade elevations, compacted layer thicknesses, roadway and shoulder widths, actual as-built superelevations, and vertical clearance/cross-section checks. |
| Traffic Audit and TMP Compliance Verification | Field monitoring records of temporary work-zone signage, detour conditions, flagger/traffic controller performance, pedestrian walkway maintenance, and road safety inspection logs. |
| Variation Orders, Unit Prices, and Quantity Adjustment Minutes | Technical review and formal approval of overrun/underrun quantity sheets, unit price analysis (APU) for unforeseen/extra work items, and engineering justifications for time extensions and contract amendments. |
As-Built Drawing Set and Quality Control Schematics
| Sheet type | Details and Graphic Elements |
|---|---|
| As-Built Drawings | Final horizontal, vertical, and cross-sectional geometry of the roadway as actually constructed, showing the exact locations of drainage structures/culverts, subsurface drains, and retaining walls. |
| Field Modifications and Redesign Drawings | Detailed plans and schematics resulting from engineering adjustments approved on-site (alignment shifts, culvert relocations, pavement transitions). |
| Relocated Utilities Coordination Drawings | Georeferenced utility plans identifying all public services and utilities relocated or protected in place during road construction. |
| Testing Sectoring and Homogeneous Section Schematics | Longitudinal control sheets displaying sampling stations for field densities, asphalt core extraction locations, and roughness/deflection testing stretches (IRI / deflectometry). |
Digital Deliverables, Modeling, and Technical Closeout
| Component | Deliverable Description | Format |
|---|---|---|
| Final Report and Technical Closeout Certificate | Consolidated final construction closeout report, final reconciliation of executed quantities, technical clearances/releases, and routine/periodic maintenance recommendations. | .DOCX .PDF |
| As-Built Database and 7D BIM Models | Updated digital corridor models incorporating as-built information for turnover to the contracting agency and for road operation and maintenance. | .DWG .IFC .LandXML |
| Site Logbook and Digital Quality Record | Digitized site work logbook (bitácora), supplier material compliance certificates, field density logs, and traceability records of resolved non-conformances. | .XLSX .PDF |
| As-Built Vector Plans and Plotting Files | Complete set of final as-built drawings in CAD format, fully titled, stamped/signed, and digitized. | .DWG .PDF |